This page shows attendance after its addition. Raise attendance can be achieved by improving the ranking, adding more to-sti photo banner placed on the main locations page and other objects of the same region.
Summer of 1942 Vinnytsia underground center under the direction of J. P. Levchenko was informed that in 1941 the German construction firm " Todt " is underground work in the forest near the village Strizhavka : dug trenches , built of reinforced concrete structures , then all covered with sand, soil cover and mask specially transplanted trees. Around the defense positions available . In addition, the information submitted to expel the Germans a large part of the local population to other villages.
In early 1942 the head of the Kiev underground Ivan Curls became aware that products of Kyiv cable plant is in the winery. After gathering preliminary information , he concluded that there is built underground military factory.
A detailed examination of the balance "Werewolf " was carried out after the war, the personal order of Stalin, Soviet NKVD operative team . In place bids , except for remnants of burned buildings and three blown reinforced concrete bunkers, nothing of value was found.